From November 1st to November 3rd, the National Power and Light Company (CNFL) will conduct several jobs that force it to interrupt electricity service in some sectors of Heredia, Tibás and Curridabat.
The disruption will take place on November 1st in Colima de Tibás, from 8:00 am to 3:00 pm, due to the relocation of high voltage towers and it will affect citizens located behind the EPA hardware, including:
-Transportes Miravalles
-Gondo Rack
-Renag
-Proyectos En Acero
-Carrocería y Pintura VS&S
-Transmisiones Mundiales
In addition, residents from La Valencia de Santo Domingo de Heredia will suffer the service disruption from 8:00 am to 4:00 pm due to lines reconstruction on November 1st.
Jardín del Recuerdo cemetery, the funeral home and the aqueducts plant, located on the north side of the cemetery, will be also affected by the disruption.
On the other hand, on November 2nd an extension of primary lines will be conducted. It will affect citizens from Barva de Heredia from 8 am to 4 pm. Reference sites are:
-Residential homes
-Bank of Costa Rica and Fishel drugstore
-Pollos Granjero and Dr. Mascota
-Chen square and Comercial Bambú
-Queques Candy and Baizan Consultores
-Santa Cecilia furniture shop and Ricamar fish market
-Pizza Bats and San Bartolomé drugstore
-Tuquitos daycare and Comercial Barva hardware store
La Cartaginesa, Pollos el Fogón and La Casa de la Mascota, in Curridabat, will be affected by the disruption on November 3rd, from 8:00 a.m. to 12:00 noon in Sánchez sector, including La Casa de Doña Lela and residential homes.