Work on Circunvalación bridge is 40 percent complete
Construction of twin 75 meter bridges to connect northern route of the Circunvalación (or beltway) is about half completed. The bridges cross the María Aguilar river and are located in the neighborhood of Hatillo 8. The project has a cost of 3.155 billion colones ($6.31 million). The bridges will be the first to connect Pavas and Hatillo.